2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui2009 NOV NOT SPECIFIED New Naftos gręžimo įrenginiai pardavimui
    Photos(9)

    2009 NOV NOT SPECIFIED

    Naftos gręžimo įrenginiai
    EUR € 1.428.892 
    Kaina įvesta kaip: USD $1,495,000

    Pardavėjo informacija

    View Seller Information

    Free Oilfield Quote

    Ryšiai:Will Veasey

    Austin, Texas, JAV 78746

    General

    Asortimento Nr.
    36286667
    Būklė
    Naujas
    Aprašas
    New Surplus 2009 NOV HydraRig Zone 2 Coiled Tubing Unit Location: Sharjah, UAE Type: New Surplus Condition: Excellent New Surplus 2009 NOV HydraRig Zone 2 Coiled Tubing Unit For Sale Notes: Unit is Trailer Mounted But Can Also Be Used Offshore as Skid Mounted Units. The package of equipment required to run a coiled tubing operation. Four basic components are required: the coiled tubing reel to store and transport the coiled tubing string, the injector head to provide the tractive effort to run and retrieve the coiled tubing string, the control cabin from which the equipment operator controls and monitors the operation, and the power pack that generates the necessary hydraulic and pneumatic power required by the other components. The dimensions and capacities of the coiled tubing unit components determine the size and length of coiled tubing string that can be used on the unit. Pressure-control equipment is incorporated into the equipment to provide the necessary control of well pressure fluid during normal operating conditions and contingency situations requiring emergency control.