Call for price
Machine Location:4111 Marathon BlvdAustin, Texas, USA 78756(Opens in a new tab)
Seller Information
View Seller InformationGeneral
Stock Number
81727352
Condition
Used
Description
Two Wind Power Installing Vessels
Type: Used
Location: China
Two Wind Power Installing Vessels Details
• 1st Wind Power Installing Vessel
• The "Fuzhou Three Gorges" offshore wind power integrated operation mobile platform was built and put into use in June 2017.
• The total length of the ship is 119.20 meters
• The width is 40.80 meters
• The depth is 7.80 meters
• The number of pile legs is 4, the full load draft is 4.60 meters
• 4 16V4000M33F diesel engines
• 4 AMG0500MK04LAA generators
• 1 16V2000M51A berthing diesel engine
• 1 LSA49.1L11/4P generator, 1 1000 ton pile winding crane
• 1 200 ton auxiliary crane, and equipped with a hydraulic self lifting system and DP-1 power positioning system.
• The original pile leg length was 85 meters, and the pile leg extension renovation was completed in January 2024.
• After the renovation, the pile leg length was 94 meters
• The hook renovation was completed in early May 2024, and the 1000 ton pile winding auxiliary hook was upgraded from 100 tons to 400 tons.
• The above renovation has obtained a CCS certificate.
2nd Wind Power Installing Vessel
• The "Daqiao Fuchuan" offshore wind power integrated operation mobile platform was built and put into use by in March 2018.
• The total length of the ship is 127.20 meters
• The width is 40.80 meters
• The depth is 7.80 meters, the number of pile legs is 4
• The full load draft is 4.60 meters, and the pile leg length is 85 meters.
• There are 4 16V4000M33F diesel engines
• 4 AMG0500MK04LAA generators
• 1 16V2000M51A berthing diesel engine
• 1 LSA49.1L11/4P generator, 1 1000 ton pile winding crane
• 1 200 ton auxiliary crane, and equipped with hydraulic self lifting.
• System, DP-1 dynamic positioning system.